340B Coalition Summer Conference · Washington DC · July

340B Coalition Summer Conference Booth Rentals

Hospitals, pharmacies and pharma in one room — talking about the same program, differently.

Fixed-price booth rentals for the 340B Coalition Summer Conference — design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so the booth meeting health-system, pharmacy and pharma leaders has already stood up once. The venue for this edition is to be announced — the facts strip at the top of this page updates automatically the moment it’s confirmed.

Booth Finder

Filters the booths below — every one shows its Washington DC price.

July 12-14, 2027Show dates · auto-updated
Venue TBAVenue
Washington DCCity
Advance orders close ~May 17, 2027
340B ProgramConference focus
Health Systems& pharmacies audience
24 hrConcepts and a fixed quote back
1Project manager, end to end
Built for healthcare & pharmacy brands

The kind of booth a compliance-minded audience trusts

The 340B Coalition Summer Conference brings hospital and health-system pharmacy leaders, community pharmacies and pharmaceutical companies together around one federal program — an audience that reads a booth the way it reads a policy brief: for substance first. The work below is what we build for brands that need to be taken seriously in that room, with every project moving through one team from first rendering to dismantle.

Know the floor before you plan the booth

One program. Two very different audiences in the room.

The 340B Coalition Summer Conference brings hospital and health-system pharmacy leaders, community pharmacies and pharmaceutical companies together around one federal drug-pricing program — different priorities, same conversation. The most expensive mistake on this floor isn’t a bad booth; it’s a booth built around generic healthcare marketing instead of program substance.

Venue to be announced

Washington DC convention logistics

The venue for this edition hasn’t been announced yet — the facts strip at the top of this page updates automatically the moment it is. In the meantime we plan around what’s consistent across Washington DC’s major meeting venues: dock scheduling, targeted move-in windows, and freight that’s billed by the hour if it misses its slot.

A floor with two sides of the same program

Health systems, pharmacies & pharma in one room

A hospital pharmacy director and a pharmaceutical account manager are reading the same booth for different reasons — one for compliance and savings, the other for program strategy. A booth that speaks clearly to both without diluting either message is doing real work here.

Summer conference season

July sits inside DC’s quieter stretch

July lands in a comparatively quieter conference season in Washington DC, which can work in your favor for freight and labor availability. Exhibit fabrication still runs on a national calendar, though, and design and build slots fill months ahead regardless of which month a show falls in.

What we handle at the 340B Coalition Summer Conference
  • Floor-specific design — sightlines planned for your actual placement
  • Layout submission and show approval, filed early
  • Electrical, rigging and material handling at advance rates
  • Labor coordination and on-site supervision
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar
  • Dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electrical, drayage, rigging and cleaning are billed to every exhibitor directly by the show — no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order at advance rather than floor rates.

  • Booth space
  • Electrical drops and floor distribution
  • Material handling (drayage)
  • Rigging, if you’re hanging a sign
  • Daily cleaning · internet
Why a fixed price matters most here

The budget you present in winter should survive summer

Trade show invoices grow the same way everywhere: labour hours over estimate, revisions rebilled as change orders, graphics reprints, supervision time nobody flagged. Our model is the opposite — the number you approve is the number you pay, contractually. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build — not a render.

03

Show costs, known up front

Space, electrical, drayage and rigging calculated for your exact booth before you commit — so the total is a number, not a range.

04

The paperwork is ours

COI, EAC, electrical, rigging, freight windows — filed at advance rates, mapped to every exhibitor-manual deadline. Nothing lands on your desk three days before it’s due.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for the 340B Coalition Summer Conference

340B-ready booths, with real prices

Every booth below is priced for Washington DC and available as a custom build for your brand — rented, not bought. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click — the catalog opens already filtered to your size and Washington DC pricing.

Working backwards from July

Your real deadline is in May

The advance-order cutoff lands roughly eight weeks before the show — the exact date is in the facts strip at the top of this page, and it updates automatically each edition. For a mid-July show that cutoff sits in mid-May, ahead of the summer stretch when travel and freight scheduling both get tighter.

DEC–FEBBrief, concepts and the fixed price locked. Full design freedom.
MARCHLayout submitted for show approval — placement confirmed.
APRILGraphics finalised and sent to production.
MID-MAYDesign locked. Advance electrical and rigging filed.
JUNEFreight window and dock target time booked once the venue is confirmed.
EARLY JULBooth built, lit and photographed for your approval.
SHOW WEEKCrew installs in your move-in slot. You walk in at handover.
Take this to every vendor

Five questions to ask anyone quoting your 340B booth

Put these to every exhibit house you’re comparing — including us. They separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign — and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually. Printed above · hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts — a better idea in April costs nothing.
3 Will I see my actual booth before it ships — or a render? Ours: the actual booth, fully assembled and lit at our facility, photographed for your sign-off before it ships. Renders are promises; photographs are evidence.
4 Who files my advance show orders, and at which rate? Ours: we do, at advance rates, mapped to every exhibitor-manual deadline — including once the venue for this edition is confirmed. If a vendor can’t answer this immediately, that’s your answer.
5 What happens if your shop is booked solid with summer conference clients? Ours: nothing to you — because your booth is already built and photo-approved before mid-May. Any vendor still fabricating in late June for a mid-July show is gambling with your timeline. Ask them directly.
In their words

What event managers say after the show

★★★★★
“They never just build the booth and disappear — I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner · Three years of booth programmes · Google Review
★★★★★
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein · Google Review
★★★★★
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista · Three-year client · Google Review
★★★★★
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner · Google Review
Questions 340B exhibitors actually ask

340B Coalition booth rental FAQs

How much does a 340B Coalition Summer Conference booth rental cost?
Every booth on this page is published with its Washington DC price — fixed and all-inclusive: design, fabrication, graphics, furniture, freight, labor coordination and project management. Separately, the show bills you directly for booth space, electrical, drayage, rigging and cleaning; we calculate those for your exact booth before you commit, so the total is known before you sign anything.
The venue hasn’t been announced yet — can you still start designing my booth?
Yes. Booth design is driven by your footprint, your brand and how you want the space to work — none of that depends on knowing the exact hall. Once the venue is confirmed, the facts strip at the top of this page updates automatically and we finalize move-in logistics, freight windows and dock timing to match.
When should I book a booth for the 340B Coalition Summer Conference?
Lock your design by mid-May. The advance-order cutoff falls roughly eight weeks before the show. Start the conversation in winter for full design freedom; the exact advance-order deadline for the next edition is in the facts strip at the top of this page and updates automatically.
Our audience includes both hospital pharmacy leaders and pharma reps — can you design for both?
Yes — this dual audience is one of the most defining features of this show. We design the messaging hierarchy so a health-system buyer sees compliance and savings at a glance, while a pharma-side visitor still gets a clear read on program strategy, without either message crowding out the other.
Will a rental look custom, or will it look reused?
Every booth is fabricated for your brand — custom graphics, layout, lighting and finishes on a modular structure underneath. The builds shown above are rentals. Before yours ships, it stands fully assembled and lit at our facility and you approve photographs of the actual booth, not a render.
Can I install the booth myself to save on labor?
Show floors run on contracted labor, governed by the show’s own rules for who may build what. Either way it isn’t your problem to arrange: labor coordination and on-site supervision are inside our fixed price, filed at advance rather than floor rates.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage — missing hardware, graphics that don’t fit, panels that won’t seat — have already been found and fixed on our floor, weeks earlier.
A vendor just fell through. How fast can you deliver a booth for this show?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10×10 through 20×40 — at the same fixed price as a six-month lead time, with no rush surcharge.
Fixed pricing · Pre-built & photo-approved · Full-service support

Exhibit at the 340B Coalition Summer Conference with zero surprises.

Tell us your footprint, your booth number if you have it, and what the booth needs to do. You’ll have design concepts and one fixed price back within 24 hours — including what the show will bill you directly.

Or call us directly — (800) 379-8451