HOW WE WORK · DESIGN TO SHOW FLOOR · ONE TEAM
However your project starts — a design you found here, a design you already own, or an idea on a napkin — it moves down the same proven line: contract, templates, schedule, show paperwork, a full pre-build you approve in photos, and a booth that arrives ready.
Stage 01 · Design
Pick the door that matches where you are today. Whichever you choose, you leave this stage with one finalized, buildable design — and everything after it is identical.
You saw a booth in our gallery that’s close. We reshape it around your brand, your products, and your footprint — colors, graphics, layout, features.
Your agency or in-house team already designed it. We engineer it for fabrication, flag anything that won’t survive the show floor, and price it straight.
An idea, a sketch, a mood board. Our designers turn it into a 3D concept, iterate with you, and lock a design you’re proud to put your logo on.
Stages 02 – 06 · The Line
Once your design is locked, your project moves down one line. You always know which station it’s at, what happens next, and what we need from you.
Fixed pricing, clear scope, and milestone dates — signed after your design is approved, so you’re never committing to a booth you haven’t seen.
The moment the ink dries, you get everything your team needs to start producing — no waiting, no guessing.
Show services are their own bureaucracy. We coordinate directly with show management and the general contractor so nothing falls through.
Every booth is 100% assembled in our 65,000 sq ft facility — graphics mounted, lighting on. You approve photo proofs of the real, finished booth. No show-floor surprises, ever.
Freight, install, show support, dismantle, return. Your team shows up to a finished booth and walks away from a finished show.
Program Clients · 6–10 Shows a Year
If you’re exhibiting six to ten times a year — or running multiple booths at once — your booth doesn’t go home between shows. It moves in a managed loop, and we run the whole rotation on one calendar.
01Show-to-show routing
Tight turnaround between shows? We route your booth from one show’s advance warehouse to the next — or back to our facility when there’s time to breathe. You never touch a freight quote.
02Inspect & refurbish between every show
Every return gets unpacked, inspected, and repaired — scuffed panels, tired lighting, worn flooring — so show six looks like show one.
03Graphics: swap them or keep them
New campaign, new product, new market? We print and mount fresh graphics for the next show. Message still working? We keep, clean, and re-pack the ones you have. Your call, show by show.
04Multiple booths, parallel floors
Overlapping shows or different footprints per city? We build and manage multiple booths as one program — each pre-staged, proofed, and tracked separately, reported together.
05One season, one schedule
All your shows live on a single program calendar — graphics deadlines, form deadlines, ship dates — so no show ever sneaks up on you.
Ready when you are
Tell us where your project is today — a design you like, a design you have, or an idea you’re chasing — and we’ll map the rest, dates and all.