AACE International Conference & Expo · Hyatt Regency Orlando · June

AACE International Conference & Expo Booth Rentals

Cost engineers price everything to the decimal. Your booth should hold up to the same math.

Fixed-price AACE International exhibits — design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so the booth built for an audience of estimators and project-controls professionals has already passed its own review.

Booth Finder

Filters the booths below — every one shows its Orlando price.

June 13-15, 2027Show dates · auto-updated
Hyatt Regency OrlandoVenue
OrlandoCity
Advance orders close ~Apr 18, 2027
Cost EngineeringThe core discipline on the floor
Project ControlsEstimators, schedulers and controls pros
24 hrConcepts and a fixed quote back
1Project manager, end to end
Know the floor before you plan the booth

AACE International runs on a hotel floor. That changes the build.

AACE International is hosted at the Hyatt Regency Orlando — a hotel meeting-space floor, not a convention-center hall. That changes freight, dock access and footprint in ways a generic booth plan doesn’t account for. The most expensive AACE mistake isn’t a bad booth; it’s a booth designed for a hall when the building is a hotel.

A hotel meeting floor, not a hall

Hyatt Regency Orlando

Freight moves through hotel loading docks and freight elevators on a tighter schedule than a convention center allows, and exhibit space is typically a ballroom or meeting-room floor rather than an open hall. We plan the booth’s footprint and freight window to the building’s actual dock capacity, not a convention-center assumption.

A project-controls audience

Estimators, schedulers, cost engineers

This floor evaluates suppliers the way it evaluates a cost estimate — by rigor, not by volume. Booths that win are precise: clean data visuals, a defensible claim, and a layout that moves a visitor from question to answer without friction.

The June problem

Advance orders land in early summer

A June show means the advance-order cutoff falls in spring. The real deadline for a locked design is roughly eight weeks out — the exact date is in the facts strip above. Miss it and you’re not late, you’re paying floor rates for everything.

What we handle at AACE International Conference & Expo
  • Hotel-floor design — footprint and sightlines planned for the actual meeting space
  • Layout submission and show approval, filed early
  • Electrical, rigging and material handling at advance rates
  • Labour coordination and on-site supervision
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar
  • Hotel dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electrical, drayage, rigging and cleaning are billed to every exhibitor directly by the show — no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order at advance rather than floor rates.

  • Booth space
  • Electrical drops and floor distribution
  • Material handling (drayage)
  • Rigging, if you’re hanging a sign
  • Daily cleaning · internet
Why a fixed price matters most here

The estimate you approve in winter should hold in June

Trade show invoices grow the same way everywhere: labour hours over estimate, revisions rebilled as change orders, graphics reprints, supervision time nobody flagged — the exact scope creep a project-controls audience is trained to catch. Our model is the opposite — the number you approve is the number you pay, contractually. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build — not a render.

03

Show costs, known up front

Space, electrical, drayage and rigging calculated for your exact booth before you commit — so the total is a number, not a range.

04

The paperwork is ours

COI, EAC, electrical, rigging, freight windows — filed at advance rates, mapped to every exhibitor-manual deadline. Nothing lands on your desk three days before it’s due.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for AACE International

AACE-ready booths, with real prices

Every booth below is priced for Orlando and available as a custom build for your brand — rented, not bought. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click — the catalog opens already filtered to your size and Orlando pricing.

Working backwards from June

Your real deadline is in spring

The advance-order cutoff lands roughly eight weeks before the show — the exact date is in the facts strip at the top of this page, and it updates automatically each edition. For a hotel-based show that window matters even more: dock and freight-elevator capacity at the Hyatt Regency Orlando is booked in advance, and it doesn’t expand the closer you get to June.

NOV–JANBrief, concepts and the fixed price locked. Full design freedom.
FEBRUARYLayout submitted for meeting-space approval — placement confirmed.
MARCHGraphics finalised and sent to production.
MID-APRDesign locked. Advance electrical and rigging filed at the eight-week mark.
EARLY MAYFreight window and hotel dock target time booked for Orlando.
MID-MAYBooth built, lit and photographed for your approval.
SHOW WEEKCrew installs in your move-in slot. You walk in at handover.
Take this to every vendor

Five questions to ask anyone quoting your AACE booth

Put these to every exhibit house you’re comparing — including us. They separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign — and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually. Printed above · hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts — a better idea in March costs nothing.
3 Will I see my actual booth before it ships — or a render? Ours: the actual booth, fully assembled and lit at our facility, photographed for your sign-off before it ships. Renders are promises; photographs are evidence — a standard this audience will hold you to anyway.
4 Who files my advance show orders, and at which rate? Ours: we do, at advance rates, mapped to every exhibitor-manual deadline. If a vendor can’t answer this immediately, that’s your answer.
5 Does a June date in central Florida change my freight plan? Ours: yes, and we plan for it — Orlando’s summer afternoon thunderstorm pattern is routine this time of year, and we build buffer into the freight and dock windows rather than treating clear weather as guaranteed. Any vendor who hasn’t thought about this hasn’t shipped freight to Florida in June.
In their words

What event managers say after the show

★★★★★
“They never just build the booth and disappear — I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner · Three years of booth programmes · Google Review
★★★★★
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein · Google Review
★★★★★
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista · Three-year client · Google Review
★★★★★
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner · Google Review
Questions AACE International exhibitors actually ask

AACE International booth rental FAQs

How much does an AACE International booth rental cost?
Every booth on this page is published with its Orlando price — fixed and all-inclusive: design, fabrication, graphics, furniture, freight, labour coordination and project management. Separately, the show bills you directly for booth space, electrical, drayage, rigging and cleaning; we calculate those for your exact booth before you commit, so the total is known before you sign anything.
When should I book a booth for AACE International?
Lock your design roughly eight weeks before the show — the exact advance-order deadline for the next edition is in the facts strip at the top of this page and updates automatically. Because the venue is a hotel with limited freight-dock capacity, starting early matters more here than at a typical convention-center show.
What’s different about exhibiting at a hotel versus a convention center?
Everything logistical: freight moves through hotel loading docks and freight elevators rather than a marshalling yard, exhibit space is usually a ballroom or meeting-room floor, and dock windows are tighter and booked further in advance. We confirm the Hyatt Regency Orlando’s dock capacity and freight-elevator schedule before designing anything, so your booth’s footprint matches what the building can actually move.
Our booth needs to show data and methodology clearly to a technical audience. Can you design for that?
Yes — this is the core design problem for a cost-engineering and project-controls floor. We build layouts around clean data visuals, defensible claims and a close-up viewing distance, because this audience evaluates a booth the same way it evaluates an estimate: on rigor, not volume.
Will a rental look custom, or will it look reused?
Every booth is fabricated for your brand — custom graphics, layout, lighting and finishes on a modular structure underneath. The builds shown above are rentals. Before yours ships, it stands fully assembled and lit at our facility and you approve photographs of the actual booth, not a render.
Can I install the booth myself to save on labour?
Hotel exhibit floors run on contracted labour, and the show’s general contractor governs who may build what. Either way it isn’t your problem to arrange: labour coordination and on-site supervision are inside our fixed price, filed at advance rather than floor rates.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage — missing hardware, graphics that don’t fit, panels that won’t seat — have already been found and fixed on our floor, weeks earlier.
A vendor just fell through. How fast can you deliver an AACE booth?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10×10 through 20×40 — at the same fixed price as a six-month lead time, with no rush surcharge.
Fixed pricing · Pre-built & photo-approved · Full-service support

Exhibit at AACE International with zero surprises.

Tell us your footprint and what the booth needs to do. You’ll have design concepts and one fixed price back within 24 hours — including what the show will bill you directly.

Or call us directly — (800) 379-8451