CAMX · Georgia World Congress Center · Atlanta

CAMX Trade Show Booth Rentals

The largest composites event in North America. Weeks away, not months. Still doable — if you start now.

Fixed-price CAMX exhibits — design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so the booth that stands up in Atlanta has already stood up once on our floor. Exhibit dates are in the facts strip below.

Booth Finder

Filters the booths below — every one shows its Atlanta price.

September 22-24, 2026Show dates · auto-updated
Georgia World Congress CenterVenue
AtlantaCity
Advance orders close ~Jul 28, 2026
6,000+Attendees on the floor
500+Exhibitors competing
24 hrConcepts and a fixed quote back
1Project manager, end to end
Know the floor before you plan the booth

One floor, five hundred exhibitors, and a clock that’s already running

CAMX brings the composites and advanced-materials industry — ACMA and SAMPE audiences together — onto a single exhibit floor at the Georgia World Congress Center. It’s a technical crowd on a tight schedule, and this edition’s timeline is tighter still. Planning the booth without planning the venue is how budgets fall apart.

Georgia World Congress Center

Downtown Atlanta · one of America’s largest venues

GWCC is a multi-building complex with its own freight rhythm: marshalling, dock target times and move-in slots are scheduled, not improvised. Freight that misses its window waits — and waiting on a show floor is billed. We plan the booth and its logistics as one job: crate specs, carrier, dock time and install crew mapped before anything ships.

A demo-first show floor

Engineers want to touch the material

CAMX attendees walk the floor to handle samples, watch processes run and interrogate the people who made them. Booths that win here are built around the part, the panel and the machine — display structure rated for real weight, power planned for live equipment, sightlines that make the demo visible from the aisle. We design for that, not for a furniture catalogue.

This year’s calendar problem

Advance windows close before the show does

The show’s advance-order deadlines land well before move-in — the current dates and deadline are in the facts strip above, and they’re close. Every order filed after advance pricing closes is billed at floor rates. The honest answer: a from-scratch custom build is no longer the smart path. A pre-built booth customised to your brand is.

What we handle at CAMX
  • Booth design for a technical audience — sample walls, demo stations, equipment placement
  • Layout submission and show approval, filed without delay
  • Electrical, rigging and material handling orders calculated and filed — at advance rates wherever the windows are still open
  • Labour coordination and on-site supervision at GWCC
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar, not yours
  • Dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electricity, drayage, rigging, cleaning and internet are billed to every exhibitor directly by the show, the venue or its contractors — no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order the moment you approve, so nothing that could still be an advance rate becomes a floor rate.

  • Booth space
  • Electrical drops and floor distribution
  • Material handling (drayage)
  • Rigging, if you’re hanging a sign
  • Daily cleaning / vacuuming · internet
Why a fixed price matters most on a deadline

A compressed timeline is where estimates go to grow

Short-lead projects are exactly where traditional exhibit invoices balloon: rush surcharges, labour overruns, revisions rebilled as change orders, freight “adjustments” nobody flagged. Our model is the opposite — the number you approve is the number you pay, contractually, whether you booked six months out or six weeks out. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price — no rush surcharge for a tight calendar.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build — not a render. On a short timeline, that check is the difference between confidence and hope.

03

Show costs, known up front

Space, electrical, drayage and rigging calculated for your exact booth before you commit — so the total is a number, not a range that surprises you after Atlanta.

04

The paperwork is ours

COI, EAC, electrical, rigging, freight windows — calculated, filed and tracked against every exhibitor-manual deadline. On a compressed calendar, a missed form costs more than a missed idea.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for CAMX

CAMX-ready booths, with real prices

Every booth below is priced for Atlanta and available as a custom build for your brand — rented, not bought. These structures already exist, which is precisely why a strong CAMX booth is still possible on this calendar. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click — the catalog opens already filtered to your size and Atlanta pricing.

Working backwards from show week

The honest late-window plan: seven steps, no shortcuts skipped

The exhibit dates and the advance-order deadline are in the facts strip at the top of this page — and they are close. This is not the six-month version of the plan; it’s the version built on pre-built inventory, where design time compresses because the structure already exists and only your brand, graphics and demo layout are new. It works because nothing on this list is improvised — each step has been run this way across seventy-plus show pages’ worth of programmes.

TODAYCall or send the brief. Concepts from Atlanta-ready inventory and one fixed price back within 24 hours. Every day here is worth more than a week later.
DAYS 2–3Pick the structure. Unlimited design revisions on branding, graphics and demo layout — the price doesn’t move.
WEEK 1Design locked. Layout submitted for show approval. Electrical, rigging and material handling calculated and filed at the best rate still open.
WEEK 2Graphics to production. Furniture, lighting and demo hardware confirmed against the approved plan.
WEEKS 3–4Booth custom-fabricated, then stood up fully assembled, powered and lit at our facility.
FINAL WEEKYou approve photographs of the actual booth. It’s packed, and freight rolls to Atlanta against a booked dock target.
SHOW WEEKCrew installs in your move-in slot at GWCC. You walk in at handover, badge on, coffee in hand.
Take this to every vendor

Five questions to ask anyone quoting your CAMX booth

Put these to every exhibit house you’re comparing — including us. On a compressed timeline they matter twice as much, because they separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign — and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually — and a short lead time doesn’t add a surcharge. Printed above · hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts — a better idea next week costs nothing.
3 Will I see my actual booth before it ships — or a render? Ours: the actual booth, fully assembled, powered and lit at our 65,000 sq ft facility, photographed for your sign-off before freight moves. Renders are promises; photographs are evidence — and on this timeline, evidence is what you want.
4 Who calculates and files my show orders — and at which rate? Ours: we do. Electrical, drayage, rigging and cleaning are billed to you directly by the show and venue — but we calculate them for your exact booth up front and file every order at the best rate still available. If a vendor can’t answer this immediately, that’s your answer.
5 Can you genuinely deliver in the weeks left — and what’s the proof? Ours: yes, from pre-built inventory: four to six weeks from approval to show floor for photo-verified booths from 10×10 through 20×40, at the same fixed price as a six-month lead. The proof is the photograph of your booth standing in our facility before it ships. Ask any vendor promising a from-scratch build in this window how they’ll show you the same.
In their words

What event managers say after the show

★★★★★
“They never just build the booth and disappear — I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner · Three years of booth programmes · Google Review
★★★★★
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein · Google Review
★★★★★
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista · Three-year client · Google Review
★★★★★
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner · Google Review
Questions CAMX exhibitors actually ask

CAMX booth rental FAQs

How much does a CAMX booth rental cost?
Every booth on this page is published with its Atlanta price — fixed, covering design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management. Separately, the show and venue bill every exhibitor directly for booth space, electrical, drayage, rigging, cleaning and internet; we calculate those for your exact booth before you commit, so the full picture is known before you sign anything.
Is it too late to book a booth for this year’s CAMX?
Not yet — but the honest answer is that the from-scratch custom route has closed and the pre-built route is what remains. Our inventory booths are complete structures that get customised with your graphics, lighting and demo layout, which compresses the timeline to four to six weeks from approval to show floor. The exhibit dates and the advance-order deadline are in the facts strip at the top of this page; the earlier this week you start, the more of your show orders still land at advance rates.
CAMX changes cities every year — why rent instead of buy?
Because the show rotates — San Diego in 2024, Orlando in 2025, Atlanta in 2026 — owning a booth means owning its shipping, storage and refurbishment across the country, every year, forever. Renting flips that: you get a custom-branded booth priced for the current city, we handle logistics end to end, and your design files carry forward so next year’s edition looks like the same programme, not a restart. This page’s URL doesn’t carry a city name for exactly that reason — it follows the show wherever it goes.
What should I know about exhibiting at the Georgia World Congress Center?
GWCC is one of the largest convention venues in the country, and it runs on schedules: marshalling, dock target times and move-in slots are assigned, and freight that misses its window waits at your expense. None of that should be your problem — we book the dock target, route the freight, coordinate labour and supervise the install, all inside the fixed price. Your job is to show up at handover.
Will a rental look custom, or will it look reused?
Every booth is fabricated for your brand — custom graphics, layout, lighting and finishes on a modular structure underneath. The builds shown above are rentals. Before yours ships, it stands fully assembled, powered and lit at our 65,000 sq ft facility and you approve photographs of the actual booth, not a render.
We’re showing physical parts and running a live demo. Can the booth handle that?
That’s the CAMX brief, and it’s what we design for: sample walls and display structure rated for real material weight, mounting for parts and panels, power planned for live equipment, and sightlines that make the demo visible from the aisle. Tell us what you’re bringing — dimensions, weight, power draw — and the booth is engineered around it rather than the other way round.
Can I install the booth myself to save on labour?
Show floors run on contracted labour, and the show’s rules govern who may build what on the floor. Either way it isn’t your problem to arrange: labour coordination and on-site supervision are inside our fixed price, and your project manager handles the paperwork that comes with it.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage — missing hardware, graphics that don’t fit, panels that won’t seat — have already been found and fixed on our floor, weeks earlier. On a compressed timeline that pre-check is not a nice-to-have; it’s the plan.
Do you handle events off the show floor — hospitality, meetings, activations?
Yes — hotel suites, meeting spaces and satellite activations around the show run under the same fixed-price model, coordinated by the same project manager as your booth.
Fixed pricing · Pre-built & photo-approved · Full-service support

Exhibit at CAMX with zero surprises.

Tell us your footprint, what you’re demonstrating, and what the booth needs to do. You’ll have concepts from Atlanta-ready inventory and one fixed price back within 24 hours — including what the show will bill you directly. The clock on this edition is real; the plan for it is too.

Or call us directly — (800) 379-8451