HIDA Streamlining Healthcare Expo · Hyatt Regency O’Hare Chicago · September

HIDA Streamlining Healthcare Expo Booth Rentals

Distributors and GPOs don’t buy on flash. They buy on who’s still standing behind the number in month eleven.

Fixed-price HIDA exhibits — design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so the booth that has to earn a distributor’s or GPO’s trust has already proven itself once.

Booth Finder

Filters the booths below — every one shows its Chicago price.

September 22-24, 2026Show dates · auto-updated
Hyatt Regency O'Hare ChicagoVenue
ChicagoCity
Advance orders close ~Jul 28, 2026
Solutions ExpoOn the show floor
Business ExchangeCo-located buyer meetings
24 hrConcepts and a fixed quote back
1Project manager, end to end
Know the floor before you plan the booth

HIDA isn’t a convention-hall show. It’s a hotel show.

HIDA runs inside the Hyatt Regency O’Hare rather than a downtown exhibit hall — which changes freight, dock access and floor scale before a single design decision gets made. The most expensive HIDA mistake isn’t a bad booth; it’s a booth sized and shipped like it’s going to a stadium-scale convention center.

Hyatt Regency O’Hare Chicago

Hotel-based show floor

A hotel convention center runs on hotel-scale docks and load-in windows — smaller than a public exhibit hall, and less forgiving of a truck that misses its slot. We size the booth and the freight plan to the building HIDA actually uses, not a generic downtown Chicago hall.

A relationship-driven floor

Distributors, GPOs & manufacturers

HIDA attendees are supply chain executives evaluating suppliers they may work with for years, and the Executive Business Exchange puts scheduled one-on-one meetings inside the same footprint as the expo. The booths that win aren’t the loudest — they’re built for a seated conversation and a clean line of sight to wherever that meeting happens.

The September problem

Summer runs light on production

A September show means advance orders and build land across July and August — the same weeks fabrication shops run reduced summer crews and staff take vacation. The real deadline for a locked design is mid-July. Miss it and you’re not late, you’re paying floor rates for everything.

What we handle at HIDA
  • Hotel-floor design — sightlines planned for your actual ballroom placement
  • Layout submission and show approval, filed early
  • Electrical, rigging and material handling at advance rates
  • Labor coordination and on-site supervision
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar
  • Dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electrical, drayage, rigging and cleaning are billed to every exhibitor directly by the show — no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order at advance rather than floor rates.

  • Booth space
  • Electrical drops and floor distribution
  • Material handling (drayage)
  • Rigging, if you’re hanging a sign
  • Daily cleaning · internet
Why a fixed price matters most here

The budget you present in May should survive September

Trade show invoices grow the same way everywhere: labor hours over estimate, revisions rebilled as change orders, graphics reprints, supervision time nobody flagged. Our model is the opposite — the number you approve is the number you pay, contractually. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build — not a render.

03

Show costs, known up front

Space, electrical, drayage and rigging calculated for your exact booth before you commit — so the total is a number, not a range.

04

The paperwork is ours

COI, EAC, electrical, rigging, freight windows — filed at advance rates, mapped to every exhibitor-manual deadline. Nothing lands on your desk three days before it’s due.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for HIDA

HIDA-ready booths, with real prices

Every booth below is priced for Chicago and available as a custom build for your brand — rented, not bought. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click — the catalog opens already filtered to your size and Chicago pricing.

Working backwards from September

Your real deadline is in July

The advance-order cutoff lands roughly eight weeks before the show — the exact date is in the facts strip at the top of this page, and it updates automatically each edition. For a September show that cutoff sits in mid-July, right as fabrication shops thin out their crews for the summer.

FEB–APRBrief, concepts and the fixed price locked. Full design freedom.
MAYLayout submitted for show approval — placement confirmed.
JUNEGraphics finalized and sent to production.
MID-JULYDesign locked. Advance electrical and material handling filed. After this, summer crews own your timeline.
EARLY AUGFreight window and dock target time booked for the Hyatt Regency.
LATE AUGBooth built, lit and photographed for your approval.
SHOW WEEKCrew installs in your move-in slot. You walk in at handover.
Take this to every vendor

Five questions to ask anyone quoting your HIDA booth

Put these to every exhibit house you’re comparing — including us. They separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign — and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually. Printed above · hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts — a better idea in June costs nothing.
3 Will I see my actual booth before it ships — or a render? Ours: the actual booth, fully assembled and lit at our facility, photographed for your sign-off before it ships. Renders are promises; photographs are evidence.
4 Who files my advance show orders, and at which rate? Ours: we do, at advance rates, mapped to every exhibitor-manual deadline. If a vendor can’t answer this immediately, that’s your answer.
5 What happens to my timeline if my show falls in the summer? Ours: nothing — because your design is locked and advance orders are filed by mid-July, before summer vacations empty the shop floor. Any vendor still fabricating in late August is gambling with your show. Ask them directly.
In their words

What event managers say after the show

★★★★★
“They never just build the booth and disappear — I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner · Three years of booth programmes · Google Review
★★★★★
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein · Google Review
★★★★★
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista · Three-year client · Google Review
★★★★★
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner · Google Review
Questions HIDA exhibitors actually ask

HIDA booth rental FAQs

How much does a HIDA booth rental cost?
Every booth on this page is published with its Chicago price — fixed and all-inclusive: design, fabrication, graphics, furniture, freight, labor coordination and project management. Separately, HIDA bills you directly for booth space, electrical, drayage, rigging and cleaning; we calculate those for your exact booth before you commit, so the total is known before you sign anything.
When should I book a booth for HIDA?
Lock your design by mid-July. A September show means advance orders come due right as fabrication shops thin out for summer vacations. Start the conversation in late winter or early spring for full design freedom; the exact advance-order deadline for the next edition is in the facts strip at the top of this page and updates automatically.
What’s different about exhibiting inside a hotel like the Hyatt Regency O’Hare?
Everything, operationally: hotel docks and load-in windows are smaller and less forgiving than a public exhibit hall, and ballroom floor space is planned differently than a convention-center aisle grid. We confirm the building and floor plan before anything is designed or booked, and size the booth and freight plan to what the Hyatt Regency can actually handle.
Can you build a booth that supports the Executive Business Exchange meetings, not just the expo floor?
Yes — HIDA pairs the Solutions Expo with scheduled one-on-one buyer meetings, and the booths that perform best are built for both: an open front for expo traffic and an enclosed or semi-private area for the seated conversation that follows. We design the layout around your meeting schedule, not just your square footage.
Will a rental look custom, or will it look reused?
Every booth is fabricated for your brand — custom graphics, layout, lighting and finishes on a modular structure underneath. The builds shown above are rentals. Before yours ships, it stands fully assembled and lit at our facility and you approve photographs of the actual booth, not a render.
Can I install the booth myself to save on labor?
HIDA’s floor runs on contracted labor governed by the show’s general contractor. Either way it isn’t your problem to arrange: labor coordination and on-site supervision are inside our fixed price, filed at advance rather than floor rates.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage — missing hardware, graphics that don’t fit, panels that won’t seat — have already been found and fixed on our floor, weeks earlier.
A vendor just fell through. How fast can you deliver a HIDA booth?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10×10 through 20×40 — at the same fixed price as a six-month lead time, with no rush surcharge.
Do you work with GPO and distributor sales teams on booth messaging, not just the build?
Yes — we design the messaging hierarchy alongside the structure, so a supply chain buyer walking the aisle understands what you distribute and who you serve in the first few seconds, before the scheduled meeting even starts.
Fixed pricing · Pre-built & photo-approved · Full-service support

Exhibit at HIDA with zero surprises.

Tell us your footprint, your booth number if you have it, and what the booth needs to do. You’ll have design concepts and one fixed price back within 24 hours — including what the show will bill you directly.

Or call us directly — (800) 379-8451