KBIS · Las Vegas Convention Center · February

KBIS Trade Show Booth Rentals

Your audience judges finishes for a living. Your booth is the first one they inspect.

Fixed-price KBIS exhibits — design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so the booth that greets the kitchen and bath industry in Las Vegas has already stood up once, under lights, on our floor.

Booth Finder

Filters the booths below — every one shows its Las Vegas price.

February 2-4, 2027Show dates · auto-updated
Las Vegas Convention CenterVenue
Las VegasCity
Advance orders close ~Dec 8, 2026
600+Exhibitors on the floor
Kitchen & BathDesign, all under one roof
24 hrConcepts and a fixed quote back
1Project manager, end to end
Built for brands the trade inspects up close

The kind of booth KBIS is judged by

KBIS attendees are designers, dealers and remodelers — people who assess cabinetry reveals, edge profiles and lighting temperature professionally. A booth with visible seams or flat lighting undercuts a premium product before a word is spoken. The work below is what we build: custom structures designed around the product story, finished to the standard your own showroom is held to, with every project moving through one team from first rendering to dismantle.

Know the floor before you plan the booth

KBIS shares its week. Plan for the whole campus.

KBIS runs at the Las Vegas Convention Center alongside the International Builders’ Show as Design & Construction Week — two shows, one campus, one shared pool of docks, labour and freight windows. Where your booth lands, and when your crate reaches it, changes everything about your build. The most expensive KBIS mistake isn’t a bad booth; it’s a booth planned without knowing the floor it’s standing on.

The LVCC, at full stretch

Big halls · long sightlines · union labour

The Las Vegas Convention Center runs on marshalling yards, dock target times and contracted union labour — and during Design & Construction Week the whole campus is working at once. Freight that misses its window waits; orders filed late pay floor rates. We build the logistics plan to your hall and your target time, not to the show’s mailing address.

Two audiences in one aisle

Designers, dealers & crossover builders

KBIS is the design side of the week — but Design & Construction Week badges cross over, so the remodeler walking your aisle may have come from the builders’ halls. The booths that win serve both: finishes and vignettes that satisfy a designer’s eye, and a demo-and-spec conversation a contractor can act on. We design for that double audience deliberately.

The February problem

Holidays sit inside your timeline

A February show means your advance-order deadlines land in early December and your production window straddles the holidays, when shops everywhere run half-speed. The real deadline for a locked design is late November. Miss it and you’re not late — you’re paying floor rates and gambling your build on the two slowest weeks of the year.

What we handle at KBIS
  • Hall-specific design — sightlines planned for your actual placement
  • Layout submission and show approval, filed early
  • Electrical, rigging and material handling orders calculated and filed at advance rates
  • Union labour coordination and on-site supervision
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar
  • Dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electrical, drayage, rigging and cleaning are billed to every exhibitor directly by the show, venue or general contractor — no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order at advance rather than floor rates.

  • Booth space
  • Electrical drops and floor distribution
  • Material handling (drayage)
  • Rigging, if you’re hanging a sign
  • Daily cleaning · internet
Why a fixed price matters most here

The budget you present in the fall should survive February

A February show is where exhibit-house invoices go to grow: labour hours over estimate, revisions rebilled as change orders, graphics reprints, supervision time nobody flagged — all of it compounded by a holiday-squeezed production calendar. Our model is the opposite — the number you approve is the number you pay, contractually. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build — not a render.

03

Show costs, known up front

Space, electrical, drayage and rigging calculated for your exact booth before you commit — so the total is a number, not a range.

04

The paperwork is ours

COI, EAC, electrical, rigging, freight windows — filed at advance rates, mapped to every exhibitor-manual deadline. Nothing lands on your desk three days before it’s due.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for KBIS

KBIS-ready booths, with real prices

Every booth below is priced for Las Vegas and available as a custom build for your brand — rented, not bought. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click — the catalog opens already filtered to your size and Las Vegas pricing.

Working backwards from February

Your real deadline is in early December

The advance-order cutoff lands weeks before the show — the exact date is in the facts strip at the top of this page, and it updates automatically each edition. But for a February show the binding constraint arrives even earlier: the production weeks this timeline assumes don’t exist between Thanksgiving and New Year. Work backwards from show week and the calendar is tighter than it looks.

AUG–SEPBrief, concepts and the fixed price locked. Full design freedom.
OCTOBERLayout submitted for hall approval — placement confirmed.
NOVEMBERDesign locked before Thanksgiving. Graphics finalised and sent to production.
EARLY DECAdvance orders filed — electrical, rigging, material handling at advance rates. After this window, the holidays own your timeline.
MID-DECBooth built, lit and photographed for your approval — before the break.
JANUARYFreight window and dock target time booked for your hall. Booth ships.
SHOW WEEKCrew installs in your move-in slot. You walk in at handover.
Take this to every vendor

Five questions to ask anyone quoting your KBIS booth

Put these to every exhibit house you’re comparing — including us. They separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign — and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually. Printed above · hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts — a better idea in November costs nothing.
3 Will I see my actual booth before it ships — or a render? Ours: the actual booth, fully assembled and lit at our facility, photographed for your sign-off before the holidays. For an audience that judges finishes professionally, renders are promises; photographs are evidence.
4 Who files my advance show orders, and at which rate? Ours: we do, at advance rates, mapped to every exhibitor-manual deadline. With Design & Construction Week filling the whole campus, the advance-versus-floor spread is real money — if a vendor can’t answer this immediately, that’s your answer.
5 What happens to my timeline over the holidays? Ours: nothing — because your booth is built and photo-approved before mid-December. Any vendor still fabricating your February booth between Christmas and New Year is gambling with your show. Ask them directly.
In their words

What event managers say after the show

★★★★★
“They never just build the booth and disappear — I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner · Three years of booth programmes · Google Review
★★★★★
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein · Google Review
★★★★★
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista · Three-year client · Google Review
★★★★★
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner · Google Review
Questions KBIS exhibitors actually ask

KBIS booth rental FAQs

How much does a KBIS booth rental cost?
Every booth on this page is published with its Las Vegas price — fixed and covering design, fabrication, graphics, furniture, freight, labour coordination, installation, dismantle and project management. Separately, the show and venue bill you directly for booth space, electrical, drayage, rigging and cleaning; we calculate those for your exact booth before you commit, so the total is known before you sign anything.
When should I book a booth for KBIS?
Lock your design by late November. A February show means graphics and approvals land across the holidays — production everywhere runs half-speed between Thanksgiving and New Year — and advance-order deadlines fall in early December. Start the conversation in late summer for full design freedom; the exact dates and advance-order deadline for the next edition are in the facts strip at the top of this page and update automatically.
KBIS and the Builders’ Show run the same week. Does that change my planning?
Yes, in two ways. Logistically, Design & Construction Week fills the Las Vegas Convention Center campus, so docks, labour and freight windows are shared across both shows — advance orders and early freight booking matter even more than usual. Strategically, badges cross over: builders and remodelers from the other halls walk KBIS aisles, so we design booths that work for a designer’s eye and a contractor’s checklist at the same time.
My buyers judge finishes for a living. Will a rental hold up to that scrutiny?
That’s exactly why the booth is pre-built. Every KBIS booth we deliver is custom-fabricated for your brand — graphics, layout, lighting and finishes on a modular structure underneath — then assembled and lit in full at our 65,000 sq ft facility. You approve photographs of the actual booth, seams and lighting included, before it ships. If a reveal or edge wouldn’t survive a designer’s inspection, we’ve already seen it and fixed it.
Can we run live demonstrations — working appliances, water features, cooking?
Live demonstration is the heart of KBIS, and we design for it: reinforced counters, appliance vignettes, demo theatres and the power layout to run them. Utility services themselves — electrical drops, plumbing, drains — are ordered through the show and venue and billed to you directly, like they are for every exhibitor. We calculate those costs up front for your exact demo plan and file the orders at advance rates so nothing is improvised on site.
Can I install the booth myself to save on labour?
The Las Vegas Convention Center floor runs on contracted union labour, and the show’s rules govern who may build what. Either way it isn’t your problem to arrange: labour coordination and on-site supervision are inside our fixed price, with orders filed at advance rather than floor rates.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage — missing hardware, graphics that don’t fit, panels that won’t seat — have already been found and fixed on our floor, weeks earlier.
A vendor just fell through. How fast can you deliver a KBIS booth?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10×10 through 20×40 — at the same fixed price as a six-month lead time, with no rush surcharge. For a February show specifically, the earlier in the fall you call, the more of that window sits outside the holidays.
Do you handle events off the show floor — showroom takeovers, suites, press events?
Yes — hotel suites, meeting spaces, satellite activations and design-event builds around the show run under the same fixed-price model, coordinated by the same project manager as your booth.
Fixed pricing · Pre-built & photo-approved · Full-service support

Exhibit at KBIS with zero surprises.

Tell us your footprint, your hall if you know it, and what the booth needs to demonstrate. You’ll have design concepts and one fixed price back within 24 hours — including what the show will bill you directly.

Or call us directly — (800) 379-8451