NANS · Caesars Palace · January

NANS Trade Show Booth Rentals

2,500 of the most sceptical buyers in medicine, in one hotel. Your booth gets one pass.

Fixed-price exhibits for the North American Neuromodulation Society Annual Meeting — design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so what stands up at Caesars Palace has already stood up once.

Booth Finder

Filters the booths below — every one shows its Las Vegas price.

January 21-24, 2027Show dates · auto-updated
Caesars PalaceVenue
Las VegasCity
Advance orders close ~Nov 26, 2026
2,500+Attendees on the floor
NeuromodulationSpecialists in the aisles
24 hrConcepts and a fixed quote back
1Project manager, end to end
Built for brands that demo serious technology

The kind of booth a clinical audience takes seriously

NANS attendees are physicians and researchers — they walk the floor to evaluate devices and data, not to collect tote bags. The work below is what we build for companies whose product demands credibility at close range: clean structures designed around the demo and the conversation, with every project moving through one team from first rendering to dismantle.

Know the floor before you plan the booth

NANS isn’t a convention center show. It’s a hotel.

The exhibit floor sits inside Caesars Palace — ballroom-style conference space with hotel docks and freight windows tighter than any convention center. That changes what you should build, how it ships, and when every order has to be filed. The most expensive NANS mistake is planning it like a big-hall show.

Caesars Palace — hotel logistics

Ballroom floor · hotel docks

A conference hotel is not a convention center: exhibit space is ballroom-style with lower ceilings, freight moves through hotel docks shared with the property’s daily operations, and move-in windows are tighter and less forgiving. Booths here need to be engineered to arrive compact, build fast, and never depend on rigging height that doesn’t exist. We design to the venue’s real constraints from the first rendering.

A compact, clinical floor

Physicians · devices · compliance

NANS is a focused medical meeting, not a mega-show: smaller footprints, denser expertise. The attendees are pain specialists, neurosurgeons and researchers, and the winning booth is built for the physician conversation — a credible demo station, seated space for a real discussion, and device presentation that respects the compliance rules your regulatory team already lives by.

The January problem

Holidays sit inside your timeline

The meeting lands in late January, which puts advance orders roughly eight weeks out — late November, straight into the holidays, when production everywhere runs half-speed. The exact advance-order deadline is in the facts strip at the top of this page. Miss it and you’re not late, you’re paying floor rates for everything.

What we handle at NANS
  • Venue-specific design — engineered for ballroom ceilings and hotel move-in
  • Layout submission and show approval, filed early
  • Electrical, material handling and cleaning calculated and filed at advance rates
  • Labour coordination with the show’s general contractor, plus on-site supervision
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar
  • Dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electrical, drayage, rigging and cleaning are billed to every exhibitor directly by the show — no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order at advance rather than floor rates.

  • Booth space
  • Electrical drops and floor distribution
  • Material handling (drayage)
  • Rigging, where the venue allows it
  • Daily cleaning · internet
Why a fixed price matters most here

The budget you present in the fall should survive January

Medical-meeting exhibit budgets die by a thousand cuts: labour hours over estimate, revisions rebilled as change orders, graphics reprints, supervision time nobody flagged. Our model is the opposite — the number you approve is the number you pay, contractually. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build — not a render.

03

Show costs, known up front

Space, electrical, drayage and cleaning calculated for your exact booth before you commit — so the total is a number, not a range.

04

The paperwork is ours

COI, EAC, electrical, freight windows — filed at advance rates, mapped to every exhibitor-manual deadline. Nothing lands on your desk three days before it’s due.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for NANS

NANS-ready booths, with real prices

Every booth below is priced for Las Vegas and available as a custom build for your brand — rented, not bought. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click — the catalog opens already filtered to your size and Las Vegas pricing.

Working backwards from late January

Your real deadline is in late November

The advance-order cutoff lands roughly eight weeks before the meeting — the exact date is in the facts strip at the top of this page, and it updates automatically each edition. For NANS the binding constraint is that those eight weeks contain Thanksgiving, the December holidays and a hotel venue with no slack in its freight schedule.

JUL–SEPBrief, concepts and the fixed price locked. Full design freedom.
OCTOBERLayout submitted for show approval — placement and any height limits confirmed.
EARLY NOVGraphics and demo-station details finalised and sent to production.
LATE NOVDesign locked. Advance electrical, drayage and show orders filed. After this, the holidays own your timeline.
EARLY DECFreight window and hotel dock target time booked with the show’s general contractor.
MID-DECBooth built, lit and photographed for your approval — before the break.
SHOW WEEKCrew installs in your move-in slot. You walk in at handover.
Take this to every vendor

Five questions to ask anyone quoting your NANS booth

Put these to every exhibit house you’re comparing — including us. They separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign — and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually. Printed above · hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts — when regulatory or marketing asks for a change in November, it costs nothing.
3 Will I see my actual booth before it ships — or a render? Ours: the actual booth, fully assembled and lit at our facility, photographed for your sign-off before the holidays. Renders are promises; photographs are evidence.
4 Who files my advance show orders, and at which rate? Ours: we do, at advance rates, mapped to every exhibitor-manual deadline. With the cutoff sitting in late November, the advance-versus-floor spread is real money — if a vendor can’t answer this immediately, that’s your answer.
5 Have you built for a hotel venue, or only for convention centers? Ours: hotel ballroom floors are a different discipline — tighter docks, lower ceilings, shorter windows. Your booth is engineered for exactly that from the first rendering, and it’s built and photo-approved before mid-December so the holidays never touch your timeline. Ask every vendor the same question.
In their words

What event managers say after the show

★★★★★
“They never just build the booth and disappear — I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner · Three years of booth programmes · Google Review
★★★★★
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein · Google Review
★★★★★
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista · Three-year client · Google Review
★★★★★
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner · Google Review
Questions NANS exhibitors actually ask

NANS booth rental FAQs

How much does a NANS booth rental cost?
Every booth on this page is published with its Las Vegas price — fixed and all-inclusive: design, fabrication, graphics, furniture, freight, labour coordination and project management. Separately, the show bills you directly for booth space, electrical, drayage and cleaning; we calculate those for your exact booth before you commit, so the total is known before you sign anything.
When should I book a booth for NANS?
Lock your design by late November. The meeting lands in late January, so advance orders fall roughly eight weeks out — straight into the holidays, when production everywhere runs half-speed. Start the conversation in summer or early fall for full design freedom; the exact advance-order deadline for the next edition is in the facts strip at the top of this page and updates automatically.
Caesars Palace is a hotel, not a convention center — does that change move-in?
Considerably. Freight moves through hotel docks that the property shares with its daily operations, move-in windows are shorter, and ballroom ceilings rule out structures that assume convention-center height. We engineer the booth for exactly those constraints — compact crating, fast assembly, no dependence on rigging that may not be available — and book the dock target time with the show’s general contractor well in advance.
We’re demoing an active device. Can the booth support it?
Yes — demo stations are designed around your device’s real requirements: power draw, counter height for guided demonstration, secure storage, cable management and sightlines for a small group around a screen or a sample. Electrical is calculated for the actual load and filed at advance rates, so there’s no scramble for extra drops during move-in.
Will a rental look right in front of a physician audience — or look reused?
Every booth is fabricated for your brand — custom graphics, layout, lighting and finishes on a modular structure underneath. The builds shown above are rentals. Before yours ships, it stands fully assembled and lit at our facility and you approve photographs of the actual booth, not a render. A clinical audience reads sloppiness fast; that’s precisely why nothing ships unproven.
Can I install the booth myself to save on labour?
The exhibit floor runs on contracted labour governed by the show’s general contractor, and hotel venues add their own rules on top. Either way it isn’t your problem to arrange: labour coordination and on-site supervision are inside our fixed price, filed at advance rather than floor rates.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage — missing hardware, graphics that don’t fit, panels that won’t seat — have already been found and fixed on our floor, weeks earlier. At a hotel venue with tight windows, that pre-check is the whole game.
A vendor just fell through. How fast can you deliver a NANS booth?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10×10 through 20×40 — at the same fixed price as a six-month lead time, with no rush surcharge. For NANS specifically, the earlier in the fall you call, the more of that window sits outside the holidays.
Do you handle events off the exhibit floor — symposia, suites, advisory-board meetings?
Yes — hotel suites, satellite symposia spaces and meeting rooms around the meeting run under the same fixed-price model, coordinated by the same project manager as your booth. At a hotel venue that’s often where half the real conversations happen.
Fixed pricing · Pre-built & photo-approved · Full-service support

Exhibit at NANS with zero surprises.

Tell us your footprint, what you’re demoing, and what the booth needs to do. You’ll have design concepts and one fixed price back within 24 hours — including what the show will bill you directly.

Or call us directly — (800) 379-8451