SEMA Show ยท Las Vegas Convention Center ยท November

SEMA Show Booth Rentals

2,300+ brands and a floor full of built vehicles. Your booth is competing with the cars.

Fixed-price SEMA Show exhibits โ€” design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so the booth that stands up next to a show car in Las Vegas has already stood up once at our facility.

Booth Finder

Filters the booths below โ€” every one shows its Las Vegas price.

November 3-6, 2026Show dates · auto-updated
Las Vegas Convention CenterVenue
Las VegasCity
Advance orders close ~Sep 8, 2026
150K+Attendees on the floor
2,300+Brands competing
24 hrConcepts and a fixed quote back
1Project manager, end to end
Built to hold the floor

The kind of booth that holds its own next to the cars

SEMA buyers walk past hundreds of aftermarket displays โ€” and past the builds themselves. A parts brand’s booth has to work like a product display and a garage at once: the structure frames the hardware, the lighting sells the finish, and the layout leaves room for the conversation that turns a distributor into an account. The work below shows the fabrication standard every Pure Exhibits booth is held to โ€” custom structures designed around what you’re showing, with every project moving through one team from first rendering to dismantle.

Know the floor before you plan the booth

SEMA fills the entire campus. Know your hall.

The SEMA Show takes over the whole Las Vegas Convention Center โ€” every hall, including the West Hall โ€” plus the outdoor lots and demo areas around it. Each hall carries its own product sections, its own docks and its own move-in rhythm, and where your booth lands changes everything from your freight window to which buyers ever walk past you. The most expensive SEMA mistake isn’t a bad booth; it’s a booth designed without knowing its hall.

LVCC โ€” every hall in play

Central, North, South & West

SEMA organises the floor by product section, so your hall is decided by what you sell โ€” and each building has different docks, ceiling heights and move-in windows. A plan built for the wrong hall costs real money at the dock. We confirm your hall and section before anything is designed, and plan freight and labour to that building’s schedule, not the show’s mailing address.

You’re exhibiting next to the cars

Vehicles raise the bar

SEMA’s show floor is full of feature builds โ€” and a booth that would dominate a regional parts show can vanish beside them. Height, lighting and finish do disproportionate work here: the structure has to frame your product the way a builder frames a car. If you’re displaying a vehicle yourself, the booth gets engineered around it โ€” sightlines, clearances and turntable or ramp staging planned from day one.

The November calendar

Advance rates end in September

SEMA lands in early November, which puts your advance-order deadlines in September and your design lock in late summer โ€” while your team is deep in its own fall season. Miss the advance window and you’re not late, you’re paying floor rates for everything. The exact dates for this edition are in the facts strip at the top of this page, and they update automatically.

What we handle at SEMA
  • Hall- and section-specific design โ€” sightlines planned for your actual placement
  • Layout submission and show approval, filed early
  • Electrical, rigging and material handling orders filed at advance rates
  • Union labour coordination and on-site supervision
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar
  • Dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electrical, drayage, rigging, cleaning and internet are billed to every exhibitor directly by the show and venue โ€” no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order at advance rather than floor rates.

  • Booth space
  • Electrical drops and floor distribution
  • Material handling (drayage)
  • Rigging, if you’re hanging a sign
  • Daily cleaning ยท internet
Why a fixed price matters most here

The budget you present in June should survive November

A big fall show is where exhibit-house invoices go to grow: labour hours over estimate, revisions rebilled as change orders, graphics reprints, supervision time nobody flagged. Our model is the opposite โ€” the number you approve is the number you pay, contractually. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build โ€” not a render.

03

Show costs, known up front

Space, electrical, drayage and rigging calculated for your exact booth before you commit โ€” so the total is a number, not a range.

04

The paperwork is ours

COI, EAC, electrical, rigging, freight windows โ€” filed at advance rates, mapped to every exhibitor-manual deadline. Nothing lands on your desk three days before it’s due.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for the SEMA Show

SEMA-ready booths, with real prices

Every booth below is priced for Las Vegas and available as a custom build for your brand โ€” rented, not bought. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click โ€” the catalog opens already filtered to your size and Las Vegas pricing.

Working backwards from November

Your real deadline is in September

The advance-order cutoff lands roughly eight weeks before the show โ€” the exact date is in the facts strip at the top of this page, and it updates automatically each edition. For a November show that means the binding decisions happen in late summer, while your team is in the middle of its own selling season. Here’s the timeline, worked backwards from move-in.

APRโ€“JUNBrief, concepts and the fixed price locked. Full design freedom.
JULYLayout submitted for hall approval โ€” placement and section confirmed.
AUGUSTGraphics finalised and sent to production.
EARLY SEPTDesign locked. Advance electrical, rigging and drayage orders filed. After this, everything costs floor rates.
LATE SEPTFreight window and dock target time booked for your hall.
OCTOBERBooth built, lit and photographed for your approval โ€” then packed and shipped.
SHOW WEEKCrew installs in your move-in slot. You walk in at handover.
Take this to every vendor

Five questions to ask anyone quoting your SEMA booth

Put these to every exhibit house you’re comparing โ€” including us. They separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign โ€” and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually. Printed above ยท hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts โ€” a better idea in August costs nothing.
3 Will I see my actual booth before it ships โ€” or a render? Ours: the actual booth, fully assembled and lit at our facility, photographed for your sign-off before it ships to Las Vegas. Renders are promises; photographs are evidence.
4 Who files my advance show orders, and at which rate? Ours: we do, at advance rates, mapped to every exhibitor-manual deadline. At a show this size the advance-versus-floor spread is real money โ€” if a vendor can’t answer this immediately, that’s your answer.
5 Have you planned around a vehicle on the floor before? Ours: yes โ€” a vehicle changes the whole engineering conversation: clearances, sightlines, staging, load paths and how the structure frames the build instead of hiding it. If your booth includes a car, that has to be in the design brief on day one, not discovered at the dock.
In their words

What event managers say after the show

โ˜…โ˜…โ˜…โ˜…โ˜…
“They never just build the booth and disappear โ€” I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner ยท Three years of booth programmes ยท Google Review
โ˜…โ˜…โ˜…โ˜…โ˜…
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein ยท Google Review
โ˜…โ˜…โ˜…โ˜…โ˜…
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista ยท Three-year client ยท Google Review
โ˜…โ˜…โ˜…โ˜…โ˜…
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner ยท Google Review
Questions SEMA exhibitors actually ask

SEMA Show booth rental FAQs

How much does a SEMA Show booth rental cost?
Every booth on this page is published with its Las Vegas price โ€” fixed and covering design, fabrication, graphics, furniture, freight, installation, dismantle and project management. Separately, the show and venue bill you directly for booth space, electrical, drayage, rigging, cleaning and internet; we calculate those for your exact booth before you commit, so the total is known before you sign anything.
When should I book a booth for the SEMA Show?
Lock your design by early September. SEMA lands in early November, so the advance-order window for electrical, rigging and drayage closes while most exhibitors are still finalising product lines for the show. Start the conversation in spring for full design freedom; the exact advance-order deadline for the next edition is in the facts strip at the top of this page and updates automatically.
Which hall will my booth be in โ€” and does it change the design?
SEMA fills the entire Las Vegas Convention Center โ€” Central, North, South and West halls โ€” and assigns halls by product section, so your placement follows your category. Each building has its own docks, ceiling heights and move-in windows, and that changes both the logistics plan and the design itself. We confirm your hall and section before anything is designed or booked.
I’m displaying a vehicle in my booth. What does that change?
Almost everything about the design: clearances, sightlines, staging, lighting angles and how the structure frames the build rather than crowding it. We engineer the booth around the vehicle from the first rendering. Vehicle logistics on the show side โ€” move-in scheduling and any placement fees โ€” are handled through the show’s own process and billed to you directly; we map those deadlines into your calendar alongside everything else.
Will a rental look custom, or will it look reused?
Every booth is fabricated for your brand โ€” custom graphics, layout, lighting and finishes on a modular structure underneath. The builds shown above are rentals. Before yours ships, it stands fully assembled and lit at our facility and you approve photographs of the actual booth, not a render.
Can I install the booth myself to save on labour?
The Las Vegas Convention Center floor runs on contracted union labour, and the show’s rules govern who may build what. Either way it isn’t your problem to arrange: labour coordination and on-site supervision are inside our fixed price, with show orders filed at advance rather than floor rates.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage โ€” missing hardware, graphics that don’t fit, panels that won’t seat โ€” have already been found and fixed on our floor, weeks earlier.
A vendor just fell through. How fast can you deliver a SEMA booth?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10ร—10 through 20ร—40 โ€” at the same fixed price as a six-month lead time, with no rush surcharge. The earlier you call, the more of that window sits ahead of the advance-order deadlines instead of behind them.
Do you handle events off the show floor โ€” hospitality suites, activations, press events?
Yes โ€” hotel suites, meeting spaces and satellite activations around the show run under the same fixed-price model, coordinated by the same project manager as your booth.
Fixed pricing ยท Pre-built & photo-approved ยท Full-service support

Exhibit at SEMA with zero surprises.

Tell us your footprint, your hall and section if you know them, and what the booth needs to do โ€” vehicle included or not. You’ll have design concepts and one fixed price back within 24 hours โ€” including what the show will bill you directly.

Or call us directly โ€” (800) 379-8451