SEMICON West · Moscone Center · October

SEMICON West Trade Show Booth Rentals

700+ exhibitors, and every visitor is an engineer reading your booth like a spec sheet.

Fixed-price SEMICON West exhibits — design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so what stands up at Moscone Center has already stood up once.

Booth Finder

Filters the booths below — every one shows its San Francisco price.

October 13-15, 2026Show dates · auto-updated
Moscone CenterVenue
San FranciscoCity
Advance orders close ~Aug 18, 2026
18K+Attendees on the floor
700+Exhibitors competing
24 hrConcepts and a fixed quote back
1Project manager, end to end
Built for technology brands

The kind of booth an engineering audience takes seriously

SEMICON West visitors don’t wander — they arrive with a problem in wafer processing, metrology or materials and a shortlist of vendors who might solve it. The work below is what we build for technology companies: custom structures designed around the demo and the technical conversation, not around the furniture, with every project moving through one team from first rendering to dismantle.

Know the floor before you plan the booth

Moscone isn’t a fairground. It’s a downtown block.

SEMICON West runs at Moscone Center — exhibition halls sitting underneath downtown San Francisco, not a suburban convention campus with acres of dock space. Freight arrives through city streets on the show’s schedule, and the audience inside is the most technical in the trade-show calendar. The most expensive SEMICON mistake isn’t a bad booth; it’s a booth planned as if this were any other show in any other city.

Moscone — a city-block venue

Underground halls, downtown docks

Moscone’s halls sit largely below street level in the middle of SoMa. Dock access is tight, marshalling happens off-site, and freight moves on scheduled targets through city traffic — there’s no forgiving parking lot to absorb a late truck. Booths engineered to install cleanly inside a fixed window win here; improvised builds pay for every lost hour.

The SEMICON floor

Engineers evaluating specs

The attendees are process engineers, fab managers and equipment buyers — people who judge a supplier by the quality of the demo and the depth of the conversation. Winning booths put working equipment, data and a place to talk at the centre: demo stations with real power and clean sightlines, and semi-private space where a spec-level discussion can run forty minutes.

The October calendar

Advance orders close in summer

Advance orders for the show’s services close roughly eight weeks out — which for an October show means mid-August, while half the industry is on holiday. The exact deadline is in the facts strip at the top of this page and updates automatically each edition. Miss it and every drop, connection and hour of labour is billed at floor rates.

What we handle at SEMICON West
  • Floor-specific design — sightlines planned for your actual placement
  • Layout submission and show approval, filed early
  • Electrical, rigging and material handling calculated and filed at advance rates
  • Union labour coordination and on-site supervision — San Francisco runs on it
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar
  • Dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electrical, drayage, rigging and cleaning are billed to every exhibitor directly by the show — no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order at advance rather than floor rates.

  • Booth space
  • Electrical drops and floor distribution
  • Material handling (drayage)
  • Rigging, if you’re hanging a sign
  • Daily cleaning · internet
Why a fixed price matters most here

The budget you present in spring should survive October

San Francisco is one of the most expensive show cities in America, and it’s where exhibit-house invoices go to grow: labour hours over estimate, revisions rebilled as change orders, graphics reprints, supervision time nobody flagged. Our model is the opposite — the number you approve is the number you pay, contractually. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build — not a render.

03

Show costs, known up front

Space, electrical, drayage and rigging calculated for your exact booth before you commit — so the total is a number, not a range.

04

The paperwork is ours

COI, EAC, electrical, rigging, freight windows — filed at advance rates, mapped to every exhibitor-manual deadline. Nothing lands on your desk three days before it’s due.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for SEMICON West

SEMICON-ready booths, with real prices

Every booth below is priced for San Francisco and available as a custom build for your brand — rented, not bought. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click — the catalog opens already filtered to your size and San Francisco pricing.

Working backwards from October

Your real deadline is in August

The advance-order cutoff lands roughly eight weeks before the show — the exact date is in the facts strip at the top of this page, and it updates automatically each edition. For an October show that puts the binding constraint in mid-August, squarely inside holiday season, when approvals slow down on your side and everyone else’s. Plan for it and the timeline is comfortable; ignore it and floor rates own your budget.

APR–MAYBrief, concepts and the fixed price locked. Full design freedom.
JUNELayout submitted for show approval — placement confirmed.
JULYGraphics finalised and sent to production.
MID-AUGDesign locked. Advance electrical, rigging and drayage filed. After this, everything is billed at floor rates.
EARLY SEPFreight window and Moscone dock target time booked.
MID-SEPBooth built, lit and photographed for your approval — before it ships west.
SHOW WEEKCrew installs in your move-in slot. You walk in at handover.
Take this to every vendor

Five questions to ask anyone quoting your SEMICON West booth

Put these to every exhibit house you’re comparing — including us. They separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign — and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually. Printed above · hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts — a better idea in July costs nothing.
3 Will I see my actual booth before it ships — or a render? Ours: the actual booth, fully assembled and lit at our facility, photographed for your sign-off before it ships to San Francisco. Renders are promises; photographs are evidence.
4 Who files my advance show orders, and at which rate? Ours: we do, at advance rates, mapped to every exhibitor-manual deadline. In San Francisco the advance-versus-floor spread is some of the widest in the country — if a vendor can’t answer this immediately, that’s your answer.
5 Can my booth power and stage a live equipment demo? Ours: yes — we design around the demo from day one: power requirements, floor loading, sightlines and the conversation space next to it, with electrical and network orders calculated for your exact equipment before you commit. A vendor who treats the demo as furniture placement hasn’t exhibited at SEMICON.
In their words

What event managers say after the show

★★★★★
“They never just build the booth and disappear — I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner · Three years of booth programmes · Google Review
★★★★★
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein · Google Review
★★★★★
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista · Three-year client · Google Review
★★★★★
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner · Google Review
Questions SEMICON West exhibitors actually ask

SEMICON West booth rental FAQs

How much does a SEMICON West booth rental cost?
Every booth on this page is published with its San Francisco price — fixed and all-inclusive: design, fabrication, graphics, furniture, freight, labour coordination and project management. Separately, the show bills you directly for booth space, electrical, drayage, rigging and cleaning; we calculate those for your exact booth before you commit, so the total is known before you sign anything.
When should I book a booth for SEMICON West?
Lock your design by mid-August. Advance orders for the show’s services close roughly eight weeks before an October show, and the weeks before that deadline sit in peak holiday season — approvals slow down exactly when the timeline needs them fast. Start the conversation in spring for full design freedom; the exact advance-order deadline for the next edition is in the facts strip at the top of this page and updates automatically.
What’s different about moving into Moscone Center?
Moscone is a downtown venue with underground halls, tight dock access and off-site freight marshalling — trucks arrive on scheduled targets through San Francisco streets, not into an open yard. It rewards booths engineered to install cleanly inside a fixed window and punishes improvisation. We book your dock target time, sequence the freight and put an install supervisor on site so the city’s constraints stay our problem, not yours.
Can the booth support live equipment demos — power, data, floor loading?
Yes, and at SEMICON West it should — the audience is engineers who came to see equipment work, not read about it. We design around your demo from the first rendering: power and network requirements, floor loading, heat, sightlines and the conversation space beside it. Electrical and internet are billed to you directly by the show; we calculate them for your exact equipment and file the orders at advance rates.
Will a rental look custom, or will it look reused?
Every booth is fabricated for your brand — custom graphics, layout, lighting and finishes on a modular structure underneath. The builds shown above are rentals. Before yours ships, it stands fully assembled and lit at our facility and you approve photographs of the actual booth, not a render.
Can I install the booth myself to save on labour?
San Francisco is a strong union town, and the Moscone floor runs on contracted union labour — the show’s general contractor governs who may build what. Either way it isn’t your problem to arrange: labour coordination and on-site supervision are inside our fixed price, filed at advance rather than floor rates.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage — missing hardware, graphics that don’t fit, panels that won’t seat — have already been found and fixed on our floor, weeks earlier.
A vendor just fell through. How fast can you deliver a SEMICON West booth?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10×10 through 20×40 — at the same fixed price as a six-month lead time, with no rush surcharge. For SEMICON specifically, the earlier in the summer you call, the more of the show’s advance-rate window we can still capture for you.
Do you handle events off the show floor — suites, meetings, evening events?
Yes — hotel suites, meeting spaces and satellite activations around the show run under the same fixed-price model, coordinated by the same project manager as your booth. In a walkable downtown like San Francisco’s SoMa, an off-floor meeting space a block from Moscone often does as much work as the booth itself.
Fixed pricing · Pre-built & photo-approved · Full-service support

Exhibit at SEMICON West with zero surprises.

Tell us your footprint, your placement if you know it, and what the booth needs to do — including any equipment it has to power. You’ll have design concepts and one fixed price back within 24 hours — including what the show will bill you directly.

Or call us directly — (800) 379-8451