The HFA Show · Mandalay Bay · March

The HFA Show Booth Rentals

Health club owners have already been sold cheap equipment once. Your booth is the first thing they judge.

Fixed-price HFA Show exhibits — design, fabrication, graphics, freight, installation and dismantle in one number that doesn’t move. Pre-built, lit and photo-approved before it ships, so the booth introducing your brand to club owners, studio operators and industry-partner suppliers has already stood up once, on our floor, before it ever stands up on theirs.

Booth Finder

Filters the booths below — every one shows its Las Vegas price.

March 10-12, 2027Show dates · auto-updated
Mandalay BayVenue
Las VegasCity
Advance orders close ~Jan 13, 2027
10,300Registrants (2026)
380Exhibitors (2026)
24 hrConcepts and a fixed quote back
1Project manager, end to end
Built for the health & fitness industry

The kind of booth club owners trust

HFA Show attendees are health club owners, studio operators and HFA’s industry-partner suppliers — buyers weighing capital purchases and long-term vendor relationships, not browsers killing time between sessions. The work below is what we build for brands that need to earn that trust fast: structures designed around the demo and the conversation, with every project moving through one team from first rendering to dismantle.

Know the floor before you plan the booth

The HFA Show isn’t a tech expo. It’s a buying floor for operators.

The HFA Show brings health club owners, fitness studio operators and HFA’s industry-partner suppliers to Mandalay Bay — buyers evaluating equipment, programming and long-term vendor relationships with a level of scrutiny most trade shows don’t see. The most expensive HFA Show mistake isn’t a bad booth; it’s a booth designed to impress instead of to earn trust.

Mandalay Bay

Las Vegas convention logistics

Mandalay Bay Convention Center runs on the same disciplined move-in and move-out rhythm as every major Las Vegas venue: targeted dock windows and labor coordination governed by the show’s general contractor, with freight that waits — and is billed — the moment it misses its slot. We plan the booth to the building’s schedule, not the other way around.

An operator’s floor

Owners & operators evaluating vendors, not browsing

This floor runs on club owners, studio operators and industry-partner suppliers making capital decisions, not casual attendees killing time between sessions. Most have already been sold trendy equipment that didn’t hold up, so the booths that win read as durable and considered — clear product visibility, real demo space, and a layout that gets a conversation started in seconds, not a light show.

The January deadline

Holidays sit inside your production runway

An eight-week advance-order cutoff on a March show lands in mid-January — the exact date is in the facts strip at the top of this page. To hit it, graphics and fabrication have to move through Thanksgiving and the December holidays, the same weeks production everywhere runs half-speed. The real deadline for a locked design is early December. Miss it and you’re not late, you’re paying floor rates for everything.

What we handle at The HFA Show
  • Floor-specific design — sightlines planned for your actual placement
  • Layout submission and show approval, filed early
  • Electrical, rigging and material handling at advance rates
  • Labor coordination and on-site supervision
  • COI, EAC and exhibitor-manual deadlines mapped to our calendar
  • Dock target times, dismantle, pack and outbound freight
Billed by the show, not by us

Booth space, electrical, drayage, rigging and cleaning are billed to every exhibitor directly by the show — no exhibit house can absorb them and none should claim to. What we do is calculate them for your exact booth before you commit, and file every order at advance rather than floor rates.

  • Booth space
  • Electrical drops
  • Material handling (drayage)
  • Rigging, if you’re hanging a sign
  • Daily cleaning · internet
Why a fixed price matters most here

The budget you approve today should survive to March

Trade show invoices grow the same way everywhere: labor hours over estimate, revisions rebilled as change orders, graphics reprints, supervision time nobody flagged. Our model is the opposite — the number you approve is the number you pay, contractually. Design revisions are unlimited until you approve. The quote and the final invoice are the same document.

01

One number, and it holds

Design, fabrication, graphics, furniture, lighting, freight, installation, dismantle and project management in a single fixed price.

02

Proven before it ships

Your booth stands fully assembled and lit at our 65,000 sq ft facility, and you approve photographs of the actual build — not a render.

03

Show costs, known up front

Space, electrical, drayage and rigging calculated for your exact booth before you commit — so the total is a number, not a range.

04

The paperwork is ours

COI, EAC, electrical, rigging, freight windows — filed at advance rates, mapped to every exhibitor-manual deadline. Nothing lands on your desk three days before it’s due.

We quote higher and cost less. That’s the whole argument, and it’s why every booth below is published with its price rather than hidden behind a “request a quote” form.

Available for The HFA Show

HFA Show-ready booths, with real prices

Every booth below is priced for Las Vegas and available as a custom build for your brand — rented, not bought. Use the finder at the top of the page to narrow by size and budget.

Or jump straight to your footprint

One click — the catalog opens already filtered to your size and Las Vegas pricing.

Working backwards from March

Your real deadline is in January

The advance-order cutoff lands roughly eight weeks before the show — the exact date is in the facts strip at the top of this page, and it updates automatically each edition. For a March show that cutoff sits in mid-January, which means the production weeks it depends on run straight through Thanksgiving and the December holidays — the same weeks fabrication and print shops everywhere slow down.

JUN–AUGBrief, concepts and the fixed price locked. Full design freedom.
SEPTEMBERLayout submitted for show approval — placement confirmed.
OCT–NOVGraphics finalized and sent to production, ahead of the holiday slowdown.
MID-JANDesign locked. Advance electrical, rigging and material handling filed. The advance-order deadline — hold this date.
LATE JANFreight window and dock target time booked for Mandalay Bay.
EARLY FEBBooth built, lit and photographed for your approval — with time to fix anything.
SHOW WEEKCrew installs in your move-in slot. You walk in at handover.
Take this to every vendor

Five questions to ask anyone quoting your HFA Show booth

Put these to every exhibit house you’re comparing — including us. They separate the vendors that stand behind a number from the ones whose estimate is an opening position. Our answers are printed here so you can hold us to them.

1 Will you put the total price in writing before I sign — and hold it? Ours: yes. Every booth on this page is published with its price. The quote and the final invoice are the same number, contractually. Printed above · hold us to it
2 Do design revisions become change orders? Ours: never. Revisions are unlimited until you approve, and the price is locked before design starts — a better idea in November costs nothing.
3 Will I see my actual booth before it ships — or a render? Ours: the actual booth, fully assembled and lit at our facility, photographed for your sign-off before it ships. Renders are promises; photographs are evidence.
4 Who files my advance show orders, and at which rate? Ours: we do, at advance rates, mapped to every exhibitor-manual deadline. For a March show those deadlines fall in mid-January, right after most vendors’ year-end shutdown — if one can’t answer this immediately, that’s your answer.
5 January is our busiest month for new-member sign-ups — does that wreck our booth timeline? Ours: no, because we build to that calendar assuming it, not around it. Design and graphics move before your season peaks, and your booth is standing, lit and photographed before your team is buried in New Year’s enrollments. Approval becomes a five-minute email, not a design session — and it’s filed before Las Vegas’s crowded March convention calendar tightens freight and labor further.
In their words

What event managers say after the show

★★★★★
“They never just build the booth and disappear — I always know I have someone on call and ready to jump in when the unexpected inevitably happens. That level of responsiveness makes a huge difference in high-pressure event environments.”
Amanda Horner · Three years of booth programmes · Google Review
★★★★★
“I’ve worked with Pure Exhibits for almost a year now, and have had such a great experience! They are our go-to for trade shows, and create memorable booths that represent our brand well. The team is incredibly responsive and reliable.”
Lexi von Schottenstein · Google Review
★★★★★
“It’s always a pleasure to work with Utsav. The process is simple, straightforward, and high quality. I have worked with them for 3 years now and will continue!”
Carlos Bautista · Three-year client · Google Review
★★★★★
“Their team is incredibly flexible throughout the design process and truly collaborative in bringing ideas to life. I highly recommend Pure Exhibits to anyone looking for a reliable, thoughtful, and experienced exhibit partner.”
Amanda Horner · Google Review
Questions HFA Show exhibitors actually ask

HFA Show booth rental FAQs

How much does an HFA Show booth rental cost?
Every booth on this page is published with its Las Vegas price — fixed and all-inclusive: design, fabrication, graphics, furniture, freight, labor coordination and project management. Separately, the show bills you directly for booth space, electrical, drayage, rigging and cleaning; we calculate those for your exact booth before you commit, so the total is known before you sign anything.
When should I book a booth for The HFA Show?
Lock your design by early December. A March show means the eight-week advance-order cutoff lands in mid-January, right as the holidays slow approvals and production everywhere. Start the conversation over the summer for full design freedom; the exact advance-order deadline for the next edition is in the facts strip at the top of this page and updates automatically.
What’s move-in like at Mandalay Bay?
Organized and time-boxed. Freight is called to the dock in targeted windows, with labor coordination governed by the show’s general contractor — arrive outside your window and your truck waits, on the clock. We book the freight window and target time to your actual move-in slot, and your project manager and install supervisor are on site through move-in. You walk in at handover.
My booth needs space for live equipment demos — treadmills, bikes, group-fitness gear. Can you handle the power and floor load?
Yes — equipment demos are what this floor is built on, and they fail on infrastructure, not intent. We spec the electrical load, drop locations and floor plan for your exact equipment, file the advance electrical order, and test the demo stations during the pre-build at our facility, so the first time your equipment runs on show power isn’t the morning the doors open.
Will a rental look custom, or will it look reused?
Every booth is fabricated for your brand — custom graphics, layout, lighting and finishes on a modular structure underneath. The builds shown above are rentals. Before yours ships, it stands fully assembled and lit at our facility and you approve photographs of the actual booth, not a render.
Can I install the booth myself to save on labor?
Las Vegas floors run on contracted labor governed by the show’s general contractor, so this isn’t a choice you can make unilaterally. Either way it isn’t your problem to arrange: labor coordination and on-site supervision are inside our fixed price, filed at advance rather than floor rates.
What happens if something goes wrong during move-in?
Your project manager and our install supervisor are on site through move-in and reachable across show days. Because everything was assembled and checked before shipping, the problems that usually surface at this stage — missing hardware, graphics that don’t fit, panels that won’t seat — have already been found and fixed on our floor, weeks earlier.
A vendor just fell through. How fast can you deliver a booth for The HFA Show?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10×10 through 20×40 — at the same fixed price as a six-month lead time, with no rush surcharge. For a March show specifically, the earlier in the fall you call, the more of that window sits outside the holidays.
Is this the same show that used to be called IHRSA?
Yes. The Health & Fitness Association — HFA — is the same organization formerly known as IHRSA, and the annual show now runs under the name The HFA Show. If you exhibited under the old name and are searching for “IHRSA booth rentals,” you’re in the right place; the show, the audience and the floor are the same one you know.
Fixed pricing · Pre-built & photo-approved · Full-service support

Exhibit at The HFA Show with zero surprises.

Tell us your footprint, your booth number if you have it, and what the booth needs to do. You’ll have design concepts and one fixed price back within 24 hours — including what the show will bill you directly.

Or call us directly — (800) 379-8451