Seven Questions That Settle Your RSAC Exhibit Partner.
Most exhibit proposals for RSA Conference look alike on page one: a rendering, a number, a promise. The differences that decide how your week goes sit underneath, in how the booth reaches a downtown dock, who is standing in it at move-in, and what the number leaves out. These are the seven questions we would ask if we were on your side of the table.
Why this show exposes a partner faster than any other
Recent editions have put more than 600 exhibitors and roughly 44,000 attendees into Moscone’s halls. Three conditions make it a harder build than the same footprint almost anywhere else.
The dock is a schedule, not a door. Freight comes through city streets to a target time. A booth that makes its slot goes up on straight time; one that misses it goes up on overtime, at San Francisco rates. The halls run on contracted labor. Hours are the cost driver, so the build that needs fewer of them wins before it ships. The demo is the booth. Security buyers stop for a working product and an engineer who can answer the third question. If the stations are not live when the doors open, the architecture around them is scenery.
A partner who has run this before plans all three in the autumn. A partner who has not discovers them in the spring, on your invoice. The Moscone guide for RSAC exhibitors covers the venue itself; what follows is how to test the people you are trusting with it.
You are not buying a booth for RSAC. You are buying the certainty that it is standing, lit and running a demo when the hall opens.
Seven questions, and what a good answer sounds like
- How many booths did you install at this show in one move-in, and how did the last one go up?
RSAC move-in is every client’s deadline at once. Ask for the count, the footprints and the crew plan. Our answer: seven exhibits in a single window at a recent edition, from a 10×30 inline to 20×30 islands, each on its own target time.
- Will our booth stand fully assembled and powered before it ships?
The first full assembly should never happen in South Expo. A serious partner builds the booth in their facility, runs power to the demo stations and sends you photographs of the actual structure for approval, not the rendering again.
- What is inside your number, and what will the show bill us directly?
Design, fabrication, graphics, AV, freight, install and dismantle can all sit in one fixed price. Space, electrical, material handling, rigging and internet are billed by the show to every exhibitor. No exhibit company controls those. The right partner calculates them for your exact booth before you sign.
- Who files the contractor notice, the insurance certificate and the advance orders, and by what date?
You want one name and one calendar. Advance pricing on power and network closes roughly eight weeks before the show, and at a demo-heavy booth the gap to floor rate is real money. See the approval order for island booths.
- Who leads our install on the floor, and how many other booths are they running that day?
A supervisor split across four halls is not supervising yours. Ask who it is, when they arrive and who your team calls at 7 a.m. on opening day.
- Where did this design start?
Listen for whether the concept began with your buyer and the conversation your team needs to have, or with what was already on the shelf. Every exhibit should be drawn around how your people and your visitors will use it for four days.
- What happens when something changes three weeks out?
A product gets renamed. A second demo is added. Ask what a late graphic or an extra station costs and who decides. A fixed price is only fixed if the change terms are written down.
Changing partners with property in storage or a show already contracted? The handover has its own sequence: changing exhibit partners without losing a show.
Read the number three ways before you compare it
Two proposals for the same island can differ by a third and describe the same spend. Put every bid into the same three columns first.
Design, structure, graphics, lighting, AV, furniture, flooring, freight both ways, install and dismantle supervision. This is the part that can and should be one fixed figure.
Space, electrical, material handling, rigging, internet, cleaning. Ask each bidder for their calculation for your booth, in writing, with the order deadline beside it.
Anything marked estimate, allowance or to be confirmed. Every open line is a decision someone will make later, usually on site, usually at a higher rate.
Our own quotes put column one in a single all-inclusive price and column two as a calculated schedule, so the only movement left is the part the venue controls. The RSAC booth cost calculator lets you model both before you speak to anyone.
The question that matters most changes with the space
The seven questions apply at every size. One of them carries more weight depending on what you contracted.
An inline has one wall and one chance. The partner’s job is a booth with an interior and a reason to step in, not a backdrop. See the 10×20 at RSA Conference.
Two demo tracks, a meeting space and overhead identity mean power, data and rigging have to agree with each other. That is proven on a shop floor, not on a drawing.
At this scale the install is a multi-day project with its own schedule. You want a named lead on your booth alone and a daily status you can forward upstairs.
Who builds booths for RSA Conference?
Exhibitors use either the show’s general contractor or an exhibitor-appointed exhibit company. Pure Exhibits designs, fabricates, rents and installs custom exhibits for RSA Conference at one fixed, all-inclusive price, from 10×10 inlines through 40×40 islands, and has run seven installs at the show in a single move-in.
When should we choose an exhibit partner for RSA Conference?
In the autumn before the show for full design freedom. The working limit is the advance-order deadline about eight weeks out: a design locked before it keeps electrical, network and rigging at advance rates.
Can an outside exhibit company work at Moscone Center?
Yes, as an exhibitor-appointed contractor. The notice and a certificate of insurance must be filed with the show by its deadline, and installation follows the labor jurisdictions in force in the halls. Your partner should file both.
What does a fixed-price RSA Conference booth include?
Design, structure, graphics, lighting, AV, furniture, flooring, freight, installation and dismantle. Booth space, electrical, material handling, rigging and internet are billed by the show to every exhibitor and should be calculated for your booth before you commit.
Put the seven questions to us.
Send your footprint, your hall if you have it and what the demo needs to do. Concepts and one fixed San Francisco price come back within 24 hours, with the show-billed services calculated beside it.
See RSA Conference booths and prices →