RSAC exhibitor series · 01 · Planning guide

The RSAC exhibitor planning guide

For people who have already exhibited at Moscone and want the building-specific knowledge, not the basics.

RSAC is the most competitive exhibit floor in security and one of the most demanding buildings in the country. This guide is the planning cycle we run for the security companies we build for at Moscone every spring — hall choice, the deadline ladder, what the show bills you directly, labour, and the decisions that cannot wait. Live dates and the advance-order deadline for the next edition are on the RSAC booth rentals page.

44K+Attendees at recent editions
600+Exhibitors across two expo halls
2Expo halls — North and South
7Security booths we built at one recent edition
Part 1 · Space and hall

The space decision is made a year before the booth

RSAC sells its expo in two halls, North and South, and priority selection for returning exhibitors happens during or right after the current edition. That means the most consequential design decision — where you are — is usually taken with next year’s budget still unapproved. Three things to settle before you pick:

Which hall matches your buyer

North vs South

The two halls are separate buildings under Howard Street, and attendees choose which to walk first. Neighbours matter more than square footage here: a 20×20 among the platforms your prospects already use outperforms a 30×30 in a quieter aisle. Read the current floor plan by category, not by size.

Corner, inline or island

Exposure per dollar

An inline 10×20 with a corner behaves like a small island for traffic; a mid-aisle 20×20 island behaves like an inline if the neighbouring structures block it. We ask for the exact position and the booths around it before drawing anything, because the design that wins depends on the sightlines you actually own.

Height and hanging signs

Check the hall rules

Ceiling height and rigging availability differ across the halls and within them. If a hanging sign is central to your plan, confirm rigging is permitted at that position before you sign — a sign you cannot fly is a hole in the design, not a saving.

Building detail — levels, ceilings, docks and the freight route — is in the Moscone Center guide for RSAC exhibitors.

Part 2 · The deadline ladder

Work backwards from show week. The binding date is in the winter.

The exhibitor services manual sets an advance-order deadline roughly eight weeks ahead of the show; after it, every show-billed line moves to floor rates. Everything below is arranged around that cutoff. The exact date for the next edition is in the facts strip on the RSAC booth rentals page and updates automatically.

SHOW WEEK −12 MOPriority space selection. Position, hall and neighbours decided. Budget envelope set.
−7 TO −6 MOBrief, concepts and a fixed booth price locked. Demo count, meeting rooms and hanging sign settled on paper.
−5 MOLayout submitted for show approval — height, structure, rigging, any enclosed room. Hotel block and staff travel booked.
−4 MOGraphics finalised and sent to production. Demo hardware, network and screen list confirmed.
−8 WEEKSAdvance-order deadline. Electrical, internet, rigging, cleaning and material handling filed at advance rates. Design frozen.
−6 WEEKSFreight window and Moscone dock target time booked. COI and EAC paperwork filed. Lead-retrieval and badge scans ordered.
−3 WEEKSBooth built, lit, powered and photographed for approval at our facility. Advance-warehouse freight ships.
SHOW WEEKInstall in your targeted move-in slot, staff walkthrough the afternoon before the welcome reception, dismantle and outbound on close.

Why the ladder starts so early: RSAC’s expo opens with a Monday-evening reception before the Tuesday floor, so the booth has to be finished a day earlier than the show dates suggest. Move-in is targeted by hall and position, and a truck that misses its slot waits.

Part 3 · Show-billed costs

What Moscone and the show bill you that no exhibit house can absorb

The total cost of an RSAC booth is the exhibit house’s number plus a set of lines billed directly to you by the show, the venue and the general contractor. The second set is where budgets break. Every line below exists at two prices — advance and floor — and the spread in San Francisco is among the widest in the country.

LineBilled byWhat drives itHow to control it
Booth spaceThe showSquare footage, hall, corner premium, sponsorship tierPriority selection; a smaller space in the right aisle
Material handling (drayage)General contractorWeight in hundredweight, crated vs loose, advance warehouse vs direct, overtime windowsLighter modular structure, crated freight, advance warehouse, no special handling
ElectricalVenue / contractorCircuits, amperage, drop locations, 24-hour power for demo hardware, labour to distribute under carpetOne floor plan filed early; consolidate drops; order 24-hour power only where servers need it
InternetVenueHard-line drops and bandwidth; conference Wi-Fi is not demo-gradeOne wired drop per demo cluster, ordered at advance rates
RiggingVenue’s exclusive riggerSign weight, motors, hang points, hall rulesConfirm rigging at your position before designing around a sign
LabourGeneral contractor / unionHours, straight vs overtime, supervision, number of tradesA pre-built structure that installs in hours; a supervised, planned labour call
Cleaning · lead retrieval · furniture add-onsShow / contractorDaily vacuuming, scanners, last-minute rentalsOrder at advance rates; furniture inside the fixed price

Put your footprint and hall into the RSAC booth cost calculator and it estimates these lines at advance and floor rates alongside a fixed booth price for that size. Every booth we build is published with its San Francisco price on the San Francisco booth rentals page.

Part 4 · Labour and freight

San Francisco is a union city with an awkward building

Jurisdiction

Who may do what

Moscone runs on contracted union labour, and the general contractor governs which tasks exhibitor staff may perform themselves. Plan on your team not building, wiring or moving crates. What you control is hours: a structure that has already stood up once installs fast, and a supervisor on site keeps the call from drifting into overtime.

The freight route

Marshalling · docks · ramps

Trucks do not simply arrive at Howard Street. Freight is marshalled off site and called to the docks on a target time, then moved into halls that sit below street level. Crate dimensions matter here more than at a Las Vegas hall. Advance-warehouse freight avoids the worst of it and is usually the cheaper drayage class.

The calendar risk

Spring show, winter deadlines

An April show puts the advance-order cutoff in early February and graphics production over the year-end break, with sample or demo hardware often arriving from overseas ahead of factory shutdowns. Teams that start planning in January discover the advance window is already closing.

The building itself — levels, connections between halls, dock reality and the walk from Moscone West — is covered in the Moscone Center guide.

Part 5 · Design decisions specific to this floor

Security buyers evaluate fast and privately

The RSAC audience is CISOs, security architects and the engineers who run the SOC. They decide in a minute whether a booth is worth their time, and the conversations that lead to a pipeline happen away from the aisle, under NDA, in front of a live dashboard. Every year we build to the same four requirements, in different proportions:

01

One claim, readable at 40 feet

The aisle test is brutal. A single message on the tallest surface you are allowed, then everything else.

02

Demo stations that draw real load

Live attack simulations, SOC consoles and telemetry dashboards need dedicated circuits, wired internet and screens that read in bright hall light.

03

Private rooms for the real conversation

Enclosed or screened rooms with acoustic separation — the place a deal is discussed while the aisle keeps moving.

04

A theatre only if you can fill it

A presentation stage earns its footprint when the speaker calendar is already booked. Otherwise the space is better spent on demo positions.

How these look built — command-centre islands, suspended overhead structures, open high-traffic inlines — is in the RSAC booth design gallery.

Part 6 · Show week

What a good week looks like from the exhibitor’s side

Runs without you
  • Structure installed in your targeted slot by a supervised crew
  • Power and internet verified live before your demo team arrives
  • Graphics, lighting and furniture matched to the photographs you approved
  • Empty crates tagged and stored; return labels ready
  • Dismantle and outbound freight booked before the floor opens
Needs your team
  • Demo hardware installed and tested the afternoon before the reception
  • Staffing plan built around the keynote schedule — the floor empties and floods with it
  • Meeting-room calendar pre-booked with prospects, not left to walk-ups
  • Lead retrieval configured and tested on real badges
  • A dismantle owner who stays until the last crate is on the truck
Questions RSAC exhibit managers ask

Planning FAQs

How early do I need to lock the booth design for RSAC?
By the advance-order deadline, roughly eight weeks before show week — the exact date is on the RSAC booth rentals page. Electrical, internet, rigging and material handling are all ordered from the final floor plan, so a design that changes after that date reorders everything at floor rates.
Which is better at RSAC, a bigger space or a better position?
Position, almost every time. The halls are walked by category and the neighbours around you decide how much traffic reaches your aisle. A well-designed 20×20 in the right block will outperform a larger space nobody passes.
What are the largest show-billed costs at Moscone?
Material handling and labour, then electrical once you are running several live demos. All three carry an advance and a floor rate, and the spread in San Francisco is wide. The cost calculator estimates each for your footprint.
Can we run live attack demos and SOC dashboards in the booth?
Yes, and most of our RSAC clients do. Each demo cluster needs its own circuit and a wired internet drop, screens specified for bright hall light, and a private viewing angle for anything sensitive. We engineer the structure around the demo list and test it energised before it ships.
Do we need a private meeting room?
If your sales cycle involves an NDA conversation, yes. Enclosed or screened rooms with real acoustic separation are the most productive square footage on this floor. Size them for a buyer and two colleagues, not one visitor.
Is renting a booth for RSAC really cheaper than owning one?
For most security companies, yes — because the property would be rebuilt for a new position every year anyway, and ownership adds storage, refurbishment and re-engineering that never appear in the first quote. A rental is designed to this year’s space, built and photographed for approval, and delivered for one fixed price.
What does a fixed price include, and what does it not?
Design, fabrication, graphics, furniture, lighting, freight, labour coordination, supervision, installation, dismantle and project management. It cannot include the lines the show and venue bill you directly — space, electrical, internet, drayage, rigging, cleaning — but we calculate those for your exact booth before you commit.
A vendor fell through. How late can a booth still be delivered for RSAC?
Four to six weeks from approval to show floor for complete pre-built, photo-verified booths from 10×10 through 20×40, at the same fixed price as a six-month lead time. Inside the advance-order window, though, the show-billed lines move to floor rates — so the earlier the call, the more of the budget stays at advance pricing.
Fixed pricing · Pre-built & photo-approved · Full-service support

Plan RSAC with zero surprises.

Tell us your hall, your position and what the booth has to demo. You’ll have design concepts and one fixed price back within 24 hours — including what Moscone and the show will bill you directly.

Or call us directly — (800) 379-8451